Vector processor
Vector processor

Basic information Vector computer, a parallel processing computer oriented to vector-based parallel computing, with a pipeline structure as the mainstay. Vector operation is a relatively simple paral...

Algorithm processor
Algorithm processor

Introduction The processor includes a central processing unit, a main memory, an input-output interface, and the addition of peripheral equipment constitutes a complete computer system. A processor...

Management Methodology
Management Methodology

Basic information Publisher: China Financial and Economic Publishing House; 1st edition (December 1, 2008) Foreign title: Management methodology Paperback: 281 pages Text language: Chinese format : 3...

Four management methods
Four management methods

Four management methodsProfessor Rensis Likert (Rensis Likert) of the University of Michigan and his colleagues have done 30 years on the leadership types and styles of leaders and managers After ye...

Project management method
Project management method

Management Overview Project management is a branch of management discipline, which refers to the use of specialized knowledge, skills, tools and methods in project activities to enable projects to b...

Management method
Management method

Basic methods The basic methods of management include administrative methods, economic methods, legal methods, and educational methods. Administrative methodMeaning: Administrative method refers to t...

Modern management methods (management terminology)
Modern management methods (management terminology)

Management methods (example) Management methods, like all human knowledge, are derived from human practice activities and continue to follow the development of human social practice and the progress o...

Time quota
Time quota

Introduction Working hours quota refers to the working time, preparation time, rest time and physiology required to complete a qualified product according to the product process under a certain techn...

Short-term quota
Short-term quota

Announcement time In 1998, it was approved and released by the National Scientific and Technical Terms Review Committee. Source The first edition of "Terms of Electrical Engineering".

Fixed time
Fixed time

In the working hour quota produced by the company, a part is the necessary time loss of 4t (such as stopping work, waiting for materials, looking for tools, etc.), which is called non-quota time, and...

Table hour quota
Table hour quota

The formula for calculating the quota of unit hour is:The time quota of a single process = the quota of unit hour×the number of equipment personnelWhen the equipment number of personnel is 1, working...

Mechanical time quota
Mechanical time quota

Unit of measurement The unit of measurement is expressed by number of shifts or number of daily labor required per unit product. Calculation formula Mechanical time quota = 1/shift output Expansion...

Logical data link
Logical data link

The above content is reviewed and announced by the National Science and Technology Term Review Committee Definition The data link layer is the first part of the OSI reference model. The second layer,...

Logical channel
Logical channel

Definition Logical channels are channels composed of different types of information that are transmitted on physical channels. The MAC layer provides data transmission services on logical channels,...

Logical operator
Logical operator

Introduction Logic NOTLogic ANDLogic ORThe priority is: NOT AND OR p>Same level operations from left to rightIn formal logic, logical operators or logical connectives connect sentences into more...

Boolean search
Boolean search

Logic Word It is represented by "AND" and "*". It can be used to indicate the intersection of the two search terms connected, that is, the intersection. If you use AND to connect search term A and s...

TOP